Metal halls, warehouses, and industrial spaces in Sibiu — fast, professional execution.
Forjon Construct SRL specializes in durable and efficient industrial construction, building metal halls, warehouses, logistics centers and production spaces tailored to each business's needs. We provide complete services: design, execution, technical consultancy and permit documentation.
We build modern metal halls with a solid structure and long service life, optimized for industrial activities, storage or production.
We cover all the stages required to complete an industrial construction project, from design to final handover.
We provide complete industrial solutions, tailored to the technical and operational requirements of each project.
We have built halls, warehouses and production spaces for companies in various fields.
We comply with technical standards and use certified materials for maximum durability.
We plan and carry out the works so that the project is completed on time and without interruptions.

Forjon Construct SRL delivers high-quality industrial construction in Sibiu. From metal halls to logistics centers, we deliver complex projects on time and to high standards.
Our experience in industrial construction allows us to successfully handle projects of any scale — from small production spaces to large logistics platforms.
Industrial construction involves obtaining technical approvals and complex building permits, from the first step to the final authorization.
Throughout a construction project, you'll come across several technical acronyms — DTAC, DTAD, DTOE, PT, DDE. So you don't get lost among them, you'll find them briefly explained below, each with its specific role in the process.
The set of plans and approvals the city hall uses to issue the permit. It is prepared jointly by the architect, the structural engineer, and the installation specialists.
It is prepared when a building needs to be torn down, fully or partially, and includes the technical expert assessment plus the actual demolition plan.
It establishes how the work area is set up: fencing, the site office, and temporary power and water connections.
The complete set of plans and calculations the on-site team actually uses to build — from structure to installations.
These complement the Technical Project with specific clarifications for situations that require more clarity on site.
| Document | Main Purpose | Who Prepares It |
|---|---|---|
| DTAC | Allows construction to begin | Architect + engineers |
| DTAD | Allows the building to be demolished | Architect + engineer + technical expert |
| DTOE | Establishes the site organization | Architect |
| PT | Guides the execution of the works | Architect + engineers + specialists |
| DDE | Clarifies construction details | Designers |